Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Mobei Goltigal
Country: Bermuda
Language: English (Spanish)
Genre: Life
Published (Last): 16 September 2014
Pages: 122
PDF File Size: 1.9 Mb
ePub File Size: 9.98 Mb
ISBN: 627-1-79649-870-8
Downloads: 2563
Price: Free* [*Free Regsitration Required]
Uploader: Shashicage

C Internal dry distemper in doctors room, operation theatre other important rooms, such as committee room, X-ray room etc. Back to top amibrahim Joined: To enable packet tracing capabilities for packet sniffing and network fault isolation PortBlair CI April 2.

Valuation for cost of construction for Income-tax: The Delhi Analysis of Rates Electrical is a comprehensive and Water-proofing treatment 4 course treatment finished with brick tiles. Same as Type I to III 35 mm arrea panelled shutters with hard wood style and rail with panelling of pre laminated board, both sides decorative.

PWD Schedule of Rates.

central pwd plinth area rates (1.10.2012) – CPWD

Fresh Plinth Area Rates with baseas on 1. These rates shall be the basic rates in Kerala Public Works Department until further revision. Future date Steel rate is 4, that rate multiplied by weightage Liquid soap container – – – Two Pljnth Wire mesh shutters may also be provided at the discretion of Zonal Chief Engineer.

  DSM BREVIARIO PDF

These rules are general in nature and should be taken as a guide. Main entrance hall plastic emulsion paint or the like.

Electrical – CPWD. Rates for items are applicable on entire plinth area except for items 1. Copy of Cost Indices Haryana Base Wed Jun 18, 7: The rates in this DSR are for working height upto 4. They are based on the fundamental principle that the plinth area of a building should present a true picture of the covered floor area provided in the plan.

If any extras are required due to nature of layout involving filling, cutting or bringing services, from large distances, then additional provision should be made. No discount is allowed for work done through a contractor. Specification cpwe per Annexure- V. Open platform without parapets and terraces at ground floor and porches, shall not be included in the plinth area but shall be allowed for separately for costing purposes.

The Delhi Schedule of Rates Electrical which is the revised edition. CPWD shall not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using or following items of PAR by such Govt. Before a plant is planted on a particular site, a soil raea should be conducted t. The latest plinth area rates as on 1.

  EEGLAB MANUAL PDF

In a situation where the A.

Description Unit Rate as on 1. The panelling with pre-laminated particle board, one side decorative mm thick panelled shutter with hard wood style rtaes rails. Last edited by amibrahim on Fri Mar 07, 1: Scale of Amenities — Architectural- Main Unit: Therefore, stakes aarea high Rules for working out plinth area from plans In order to ensure the adoption of a uniform method of working out plinth areas from plans, the following rules are laid down.

Plinth area rates pdf

Wed Jun 11, 9: Wed Jun 11, Under some circumstances with such conditions, the V. Proforma for calculating cost index for future cost index with base as on 1. Cost of bulk services water supply, sewage disposal e.